Magnetite Mines Ltd. has confirmed additional rare earth mineralisation at its Ironback Hill project in South Australia following an expanded re-testing program.
Additional laboratory results from re-assayed archived drill samples confirm further near-surface rare earth element mineralisation. Significant intercepts include eight metres at 1238 parts per million (ppm) total rare earth oxide (TREO), 260ppm neodymium(III) oxide (Nd2O3) from 28 metres to 36 metres.
This is within 24 metres at 1048ppm TREO, 194ppm Nd2O3, from 10 metres to 34 metres, extending from the previously reported 18 metres at 866ppm TREO from 10 metres to 28 metres.
Magnetite Managing Director Tim Dobson said the company’s geological models show a strong correlation between mineralised horizons and local creek systems.
“To better define the extent and character of this mineralisation, the company will undertake a small, scout drilling program to test continuity, variability and metallurgy.
“This work is consistent with our strategy to increase shareholder value through disciplined, selective exploration of critical minerals. In a constructive but discriminating market for these commodities, it is encouraging that the mineralisation identified to date is in low-density pastoral country close to existing infrastructure, supporting efficient follow-up activities.”
The results provide the basis for a scout drilling program planned for the first quarter of 2026, comprising of roughly 1,000 to 2,000 metres of air-core drilling to approximately 40 metres to 60 metres depth, targeting oxidised near-surface clay horizons along priority creek lines.
Magnetite has also applied for a low-cost exploration tenement covering the south-eastern extent of the local drainage and creek network.
The Department of Energy and Mining passed the application’s validity assessment.
“Our next steps are deliberately capital-light and decision-gated: confirmatory scout drilling, mineralogical characterisation and leachability testing to assess continuity and extractability before we consider a larger program,” Dobson said.
“This disciplined approach aligns with our broader tenement review, while Razorback remains the company’s core development focus.”






